name

Project

Knutson yawl

topsides

The boat came to our shop needing many repairs. Here we have begun refastening the bottom. Some sister ribs were installed also.

stern deck

The cockpit needed some new teak seats. The original teak sole was good but needed new seam compound.

stern deck

Here's the completed hull, all painted and ready to launch. Note we got rid of the red boottop stripe and went back to a traditional paint scheme.

boat bottom

Two planks need replacing.

transom

The transom was structurally sound but looked rough, so we applied a thin mahogany laminate.

transom

After the mahogany laminate.